The photo below shows the three rows of concrete columns that will carry the load of the house, pluss 600 kg/m2 of possible snow. As you see they are slightly higher than the ring foundation, to elevate this part of the cabin. My worry is how the landscape facilitates this level difference now that we had to remove all the soil. My guy with the tractor says its going to be great, and by the look of all the gravel that he has put there it looks promising.
Viser innlegg med etiketten Fundamentering. Vis alle innlegg
Viser innlegg med etiketten Fundamentering. Vis alle innlegg
torsdag 15. oktober 2009
The snow has arrived
lørdag 3. oktober 2009
Pillars
The cast for the columns are now beginning to be placed throughout the site. We decided to use the space inside the foundation as a mini-cellar for different technical installations, instead of digging stuff down on other places on the site. Saved a lot of money right there. Sometimes you wonder why you didn`t think of that before. They said it was going to snow 20cm the day after this picture was taken, so maybe this is the last picture were its not all white....mh, winter is just around the corner allready, especially up there.Luckily my contractors are used to working in these conditions.
fredag 25. september 2009
Fundamenteringen er igang
Ringmuren blir fylt igjen med masse, for så å støpe betonggulv oppå. Det lille rommet i ene hjørnet blir teknisk rom for bereder og vanntank. Dette ligger da under gang og bod. Da fikk jeg også støpt gulv innover i hele gangen.
Abonner på:
Innlegg (Atom)