The door is now semi-concealed by a tilted roof (same angle as the main roof, 11 and 3 degrees) and a storage space.

I was afraid the heights were to low and the proportions were to narrow, but it turned out really nice.

The red door looks as magnificent as ever.

The ceiling in the storage space is quite low at the lowest corner, but the heights are changing throughout in the same way as inside the cabin itself.

I wonder how the snow will swirl and create piles around the entrance area. Hopefully it will blow right through and keep our doorway free from snow.

This is were the ladder/stair up to the hems will be.We are working out the details on this now, but that is the last thing they will do.

Painting on the moist membrane before adding the heating cables and the top cast of concrete that will be polished. 

The whole site was brushed black due to the drilling for water. They now reached 120 meters and still no water. The neighbors reassured us that they had the same situation and that by adding water and pressure connections between the whole and the underground water ores will be made. I sure hope it will snow again before our neighbors come.

 